Rama IX entrance
Ratchadapisek Rd, Bangkok |

Fire rated construction
sloping head stainless steel doors under escalators. Public area Rama
IX station, South Line. |
The MRTA project in
Bangkok consisted of over 20 kilometres of tunnels and track, linking
18 underground rail stations, which was constructed by two Joint Venture
organisations - ION JV and BCKT JV.
Building Protection Systems (a Pyropanel licensee) became involved in
discussions with each of the JV companies and MRTA representatives from
late 1998 and eventually secured contracts to supply approximately 2,500
door leaves to the project. Practical completion of supply and installation
was achieved at the end of 2002.
Approximately 50 different types of doorsets were required on the project.
All fire doorsets were required to fully comply with BS 476 parts 20-22
for partially insulated doorsets. The range of approvals required was
complex and included the following:
- Steel and stainless
steel single leaf and double leaf doorsets up to 2100(h) x 2400(w).
Up to 3 hour fire rated.
- Steel and stainless
steel double doorsets with removable transoms up to 2700(h) x 2400(w).
Up to 3 hour fire rated.
- Large removable
steel and stainless steel access panels with central mullions up to
3500(h) x 2700(w). Up to 3 hour fire rated.
- Acoustic rated
fire doorsets.
- Various hardware
types and functions.
- Doorsets could
not contain combustible materials.
- Smoke sealed fire
doorsets.
This
project was unique in Thailand insofar as all products and systems
used were required to meet the highest International Standards. Building
Protection Systems was selected as the principal supplier of fire
rated doorsets for the project because Pyropanel fire doorsets met
all of the criteria required for the project.
Prior to commencement of manufacture, Building Protection Systems
was consulted extensively by the project architects and designers
to assist with final design and specification of the fire doorsets
used on the project. |

View of tunnel and track looking south
from Rama IX station.
|
 |
2
hour single leaf and double leaf fire doors on concourse.
Public area Rama IX station,
South Line |
Pyropanel Developments assisted Building Protection Systems by sending personnel
to Bangkok to participate in direct discussions with various parties involved.
Pyropanel also obtained a number of Letters of Assessment from BRANZ, which
were required because of specific project requirements.

BRANZ test of stainless steel pair fire
doorset for MRTA project.
Doors achieved 4 hours+ integrity. |
As
final validation of the Pyropanel products, Building Protection Systems
was required to manufacture a pair of stainless steel hinged fire
doors, which were sent to New Zealand for BS 476 part 20-22 fire testing
at BRANZ laboratories. The fire test was conducted in October 2001
and was witnessed by representatives from the MRTA and the BCKT JV.
As expected the doorset passed the fire test with flying colours and
achieved fire Resistance levels of 250 minutes integrity and 78 minutes
insulation. |